Search Type
By Flight Number
Flight Number
Date
6E 249 Flight Status
DEPARTURE
8 MINS EARLY
Goa (South) (GOI)
Goa (South) - Dabolim International Airport
Gate Number - NA
ARRIVAL
23 MINS EARLY
Bengaluru (BLR)
Bengaluru International Airport, Terminal 1
Baggage Belt 01
Scheduled departure
07:55
14 May 2026
Actual departure
07:47
14 May 2026
EN ROUTE
1h:10m
This flight is expected to arrive in 49 mins
Scheduled arrival
09:20
14 May 2026
Expected arrival
08:57
14 May 2026
Flight Performance
On time82.1%
Avg. Punctuality
82.1%
Avg. Departure Time
07:45
Avg. Arrival Time
09:00
Weather at Bengaluru
27.5 °C
Rain
Precipitation: 2.06%
Humidity: 52%
Wind: 17.3km/h
Aircraft
Airbus A320 N
3-3 Layout
Seating
28 cm legroom
Wide Seat
Info Unavailable
Amenities
BeveragesBeverage Available
Disclaimer: Please re-confirm any change in flight timing with your airline and reach the airport 3 to 4 hours before your flight departure time. MakeMyTrip tries its best to give you an accurate flight timing information and shall have no accountability whatsoever, for any loss amounting from inconsistency in the above information.
